TRETHEWAY CREEK HYDROELECTRIC

Owner/Client: Innergex

Location: Tipella, BC

Dates: 2013 – 2015

Design build (EPC) construction of a 23 megawatt run of the river hydroelectric power plant. Construction included intake, powerhouse including installation of generator, and installation of 4.7 km of steel penstock.