TRETHEWAY CREEK HYDROELECTRIC
Owner/Client: Innergex
Location: Tipella, BC
Dates: 2013 – 2015
Design build (EPC) construction of a 23 megawatt run of the river hydroelectric power plant. Construction included intake, powerhouse including installation of generator, and installation of 4.7 km of steel penstock.