Summerland, BC
Select: DENT Infrastructure projects Infrastructure

Project overview

This project involved the replacement of the Low Level Outlet pipe at the Isintok Dam near Summerland, BC. As part the project DENT performed earthworks, reservoir draw down, installation of 100m HDPE pipe for the outlet, concrete structures, access road improvements, and rip rap installation for armouring. The project was a major step for Summerland to increase safety for downstream residents and increase water storage capacity. You can learn more about this project here.